7/5/23

Remodeling light fixture prep, vanity view, Wednesday library day

Here is our very pretty main vanity outside the box, but still in our garage.
So funny story now, but stressful at the time. When Collin first tried out the shower, the handle came out and made a huge bang and water started going everywhere. It was very weird and we were all wondering what the heck had happened.....so the next time my dad came down we discovered the cartridge was put in backwards. These pictures were after my dad adjusted it....
And here he is testing it out. I had a little case of PTSD and was so scared to even hear the shower going. But, all was well!
Wahoo! First part of the remodel is available, the shower!
Once again, to get out of everyone's way, I took the girls to Library Wednesday, where they had a guy come that had some cool birds of prey.


Can you believe this owl has 500 lb of grip pressure? HOLY HANNAH!

Light fixture in the little vanity is up!
Starting to measure out the floor tile with the laser.
Out of order wall prep for painting and electrical.


Main area painted.


Liam is helping!
Main light fixture is in. I LOVED that we took out the dumb little shelf thing with the glass covering that always was gross and dark and yucky, so not having the shelf over there will open up SO much space.

 