7/5/23

Adeline gets to move to level 0! And more remodeling with the shower and tiling of shower

Here is Kyle, Adeline's feeding therapist. We have been on level 0 for a month basically and NO PROBLEMS. Kyle said we could just keep doing what we are doing and if we have to move up to level 1, and just watch closely for a few months, but hopefully we are in the clear!
0 LEVEL!
Working on the niches with the sealing tape.

These niches took a LOT of work. They look so good now, but they were intense.
Toilet room painted.
Doing the blue stuff which makes another level of water proof.

Pre tiling ready.

Working more to prep for the large vanity.

Toilet room getting ready for floor.


Doing our many "bathroom" trip to Harmon's when our water was off while the plumbers were working. Here is how Adeline went to the bathroom before swimming, goggles and all.

Collin helped a lot with the shower tiling.

We are on the third wall!
Most of the two walls were done minus lower layer.


Almost done.
Out of order pic drinking colored regular water at therapy :)
Out of order pics prepping the toilet room for painting.


Pre shower tiling pics.

Painting the main shower room.
 